Facebook

Tweet

Help


Using environmentally friendly methods, Tiling Waterproofing Services carried out work on Green Square.

Preparing for the unexpected is an industry standard

A new concrete mix that can be created with less carbon dioxide emissions was produced for the development of Green Square.

Choosing the right tools for the job takes experience

Protecting the building site was the work of Executive Protection Services.

Developing a project as large as Green Square required the time management services of The Tracey Brunstrom & Hammond Group.

As a response to its urban situation, the needs of its future tenants, and the fragile nature of world resources, the Green Square office park in Queensland lives up to its name

James Design planned energy efficient electricity systems for Green Square.

McFadyen Pipeline Constructions worked alongside Butler Partners in sorting contaminated soil and installing pipelines and roadways.

Drafting the structural steel drawings for Green Square was the work of DKL Drafting.

Lowline provided and installed the sunshading panels and louvres for Green Square.

Mayco IJF worked closely with the architects and builders to create custom made furniture for Green Square.