Trendsideas
Home kitchen bathroom commercial design
hard and fast
For a timber floor that will hold its own in a high traffic, high impact area, check out the key advantages of Selleys® Liquid Nails¢ Direct Stick¢
Future perfect
Butler Partners was involved in the removal of contaminated soil from the Green Square site.
Future perfect
Q Electrical worked alongside James Design in creating electrical systems for Green Square.
Future perfect
Using environmentally friendly methods, Tiling Waterproofing Services carried out work on Green Square.
Future perfect
A new concrete mix that can be created with less carbon dioxide emissions was produced for the development of Green Square.
Future perfect
Protecting the building site was the work of Executive Protection Services.