Facebook

Tweet

Help


For a timber floor that will hold its own in a high traffic, high impact area, check out the key advantages of Selleys® Liquid Nails¢ Direct Stick¢

Structural integrity is paramount to building safety

Roofing for Green Square was carried out by Mo's Roofing.

Butler Partners was involved in the removal of contaminated soil from the Green Square site.

Quality is a prerequesite for design and construction

Q Electrical worked alongside James Design in creating electrical systems for Green Square.

What lies beneath defines a project's success

Using environmentally friendly methods, Tiling Waterproofing Services carried out work on Green Square.

Preparing for the unexpected is an industry standard

A new concrete mix that can be created with less carbon dioxide emissions was produced for the development of Green Square.

Choosing the right tools for the job takes experience

Protecting the building site was the work of Executive Protection Services.