Trendsideas
Home kitchen bathroom commercial design
FROM SMALL SEEDS
Remarkables Primary School is extending the classroom boundary to include its new green roof.
6-Star outcome
For a project to be considered successful, cost management must be well controlled. Rider Levett Bucknall achieved this for Christchurch City Council's new premises
Catch a wave
This vibrant outlet achieves the inviting, relaxed ambience of a surf shack the complex fit-out was by Cape Interior Construction
Walk the talk
A dated, poorly insulated 1990s building has been transformed into a fully sustainable, eco-friendly office for the Department of Conservation
SURFACE attraction
The cladding system for this building was supplied by Unicast Cladding Systems to create the look required by the project architect
Versatile strength
The new prison is constructed in the architectural vernacualr of concrete, glass and steel Dominion Contractors provided the broad skill set required
TECHNICAL CHALLENGE
Assembling and installing the facade on the renovated Christchurch City Council premises was one of the largest projects ever undertaken by Alu-fix
Steely resolve
Specialist stainless steel solutions contributed to the safety and untarnished look of the new facility Tata Steel International provided the fabricated material
HIDDEN ASSETS
For the base build and tenancy fit-out of the Britomart East complex, Norman Disney & Young provided mechanical, electrical, hydraulic, lift, fire and acoustic base building design services.