Save

Facebook

Tweet

Email

Help

Raised expectations Kone high-tech elevator solutions for ANZ Centre

Share Tweet Help

Kone high-tech elevator solutions for ANZ Centre

Raised expectations  Kone high-tech elevator solutions for ceiling, floor, interior design, gray
Raised expectations Kone high-tech elevator solutions for ANZ Centre
Raised expectations  Kone high-tech elevator solutions for ceiling, floor, interior design, gray
Raised expectations  Kone high-tech elevator solutions for architecture, ceiling, daylighting, floor, house, interior design, lobby, gray
Raised expectations  Kone high-tech elevator solutions for engineering, factory, industry, machine, manufacturing, technology, gray
Raised expectations  Kone high-tech elevator solutions for engineering, industry, machine, manufacturing, gray

A comprehensive revamp of the ANZ Centre by architects Warren and Mahoney encouraged lead tenant ANZ Bank to retain its presence there. The company required a high-performance working environment that would include new plant and infrastructure to service the refurbished floors. As part of the project's focus on sustainability, a destination-controlled elevator system was supplied and installed by Kone, a global leader in the provision of elevator and escalator solutions.

This contemporary fit-out at the ANZ Centre allowed Kone to showcase its very latest lift technologies, says Kone sales manager Terry Viccars.


Raised expectations  Kone high-tech elevator solutions for engineering, industry, machine, manufacturing, gray
Raised expectations Kone high-tech elevator solutions for ANZ Centre

"The control system uses advanced artificial intelligence, genetic algorithms and fuzzy logic to learn traffic patterns in a building to predict passenger demand and continually adjust call assignment accordingly. In addition, the lifts assigned to ANZ staff and visitors have a higher level of security and convenience, through integrated turnstile technology that recognises authorised personnel, then allocates a lift and selects the appropriate floor at the swipe of a card. There's no longer any need to press lift buttons."

The ANZ Centre was tenanted throughout the project and Kone's control overlay allowed its new technology to talk to older equipment from another firm, keeping the building moving during the renovation.

Story by: Trendsideas

19 Jun, 2013

Home kitchen bathroom commercial design


Latest Post

03 Apr, 2025

30 Mar, 2025

30 Mar, 2025

We know the Specialists

Hot spring highlife aria aspot lifestyle01 2

Hot Spring Spas

Endless Summer Forever in your Backyard

SL407071

Sustainability and style meets high-end roofing and cladding

2018043 LR 11 Picture by Lior Teitler 1 1

Bamboo X-treme Cladding

Images 1

Plantation Bamboo

SLN 1054 2

Architectural + Design

Similar Stories

advertisement

advertisement

advertisement

advertisement

advertisement

advertisement

advertisement