Facebook

Tweet

Help

Image 2 of 2

ITC Group was responsible for the design of all the building services for the UBS fit-out, including lighting control, air conditioning, security, enviromental monitoring, fire, hydaulics, and the power supply

ITC Group was responsible for the design of all the building services for the UBS fit-out, including lighting control, air conditioning, security, enviromental monitoring, fire, hydaulics, and the power supply

Associated Post

18 Nov, 2007

Home kitchen bathroom commercial design


Latest Post

26 Apr, 2026

26 Apr, 2026

26 Apr, 2026

We know the Specialists

Latest Book

TRENDS MINI COVER 4201 -

Home Kitchen Bathroom Design 

Read More