ITC Group was responsible for the design of all the building services for the UBS fit-out, including lighting control, air conditioning, security, enviromental monitoring, fire, hydaulics, and the power supply
Up with the play
Home kitchen bathroom commercial design
Little by little
Seaspray meets sumptuous
Calming and connected