Facebook

Tweet

Help

Image 3 of 3

The 34m-long laminated beams over the main pool at the St Cuthbert’s Centennial Centre for Wellbeing were manufactured locally. Their installation required close collaboration between riggers, crane drivers and builders. The main contractor was Domi

The 34m-long laminated beams over the main pool at the St Cuthberts Centennial Centre for Wellbeing were manufactured locally. Their installation required close collaboration between riggers, crane drivers and builders. The main contractor was Dominion Constructors.

Home kitchen bathroom commercial design


Latest Post

24 Nov, 2024

24 Nov, 2024

24 Nov, 2024

We know the Specialists

Latest Book