Conslab supplied and installed more than 11,000m³ of concrete for the new JPL Distribution Centre. To ensure the floor would be completely flat with minimal joints, the company employed a laser screed technique. This enabled Conslab to pour large bay

Conslab supplied and installed more than 11,000m³ of concrete for the new JPL Distribution Centre. To ensure the floor would be completely flat with minimal joints, the company employed a laser screed technique. This enabled Conslab to pour large bays of about 2500m² each day. Specialist surveying equipment sourced from Sydney was used to ensure the required standard was maintained.