The division into several separate batches of the structure (concrete, steel and wood) allowed the simultaneous production in the factory of colossal quantities of material as well as their erection in a very limited period of time and despite a harsh winter.
A sustainable Grand Prix?
Home kitchen bathroom commercial design
Opening the door to 5 creative powder rooms
Protection and prospect
From office to edgy apartment