Lot 3 comprises two buildings and a two-level underground carpark. Innovative steps were adopted by Canam Construction to ensure the site remained dry despite the ground water level being much higher than the excavation levels.
Home kitchen bathroom commercial design
Who won? – 2024 TIDA Homes awards results announced
Stone, wood and metal
Memories of the Alhambra