During the strengthening and restoration of Orange Hall, architecture, brutalist architecture, building, commercial building, corporate headquarters, daytime, facade, headquarters, landmark, metropolitan area, structure, gray, black
Share Tweet Help

advertisement

Image 1 of 9

During the strengthening and restoration of Orange Hall, two of the four perimeter walls were stabilised with 10m high precast concrete panels.

During the strengthening and restoration of Orange Hall, two of the four perimeter walls were stabilised with 10m high precast concrete panels.